Scrap electrodes are not waste; they are mis-sold raw materials
Date:2026-10-15 Views:119
Lithium battery production capacity continues to expand, with each production line yielding not only batteries but also a considerable amount of waste electrode sheets and cut-offs. The fate of these materials is rather awkward: unsealed and unrecycled, their material properties remain largely intact, yet they are often sold as low-value scrap or simply crushed and sold as black powder with excessive impurities—thus, high-purity cathode materials and copper-aluminum foils lose their value.
The entire production line operates through four key modules: cutting and de-powdering, pyrolysis, environmental protection, and crushing and packaging. The core rotary furnace features specialized optimizations in sealing and temperature control, enabling internal oxygen levels to be reduced to the PPM level, with temperature curves customized based on materials and processes. During this stage, binders are directed to decompose, while active substances and current collectors are dissociated with minimal damage. The resulting recycled cathode powder approaches the particle size distribution and specific capacity of virgin material, directly qualifying for the cathode material blending process. Concurrently, the accompanying environmental protection system handles all organic exhaust gases, dust, and fluorides generated during the process, ensuring compliance with emission standards with built-in margins.
Hengli has developed a complete production line for the regeneration of such materials, with core equipment already validated in spent battery recycling projects. Now, the same thermal process logic has been adapted to the scenario of waste electrode sheets, directly addressing several persistent issues: uneven heating, internal blockage, and fluctuating product quality.
The significance of modularization lies in the implementation phase: battery factories can integrate production lines into their internal production systems, enabling on-site material recycling. Resource utilization projects can also configure units based on processing capacity, avoiding the cost of customizing unused functions. This loop—"production waste—regenerated materials—reintegration into production lines"—now has replicable equipment support.
